Manufacturing · Direct · 2024
FPSO P-78 (Búzios 7)
Newbuild FPSO
What the record says
P-78 is the culmination of over 15 years of Seatrium collaboration with Petrobras, rated at 180,000 bopd. Delivered in 2025 as the first of the P-78 / P-80 / P-82 / P-83 newbuild series, cementing Seatrium's position as the only shipyard with the Brazilian track record to meet Petrobras's 20–25% local content requirement. ENGIC executed during the final 2024 construction phase.
Direct contract — valve and piping works to Seatrium O&G Americas, Aug–Nov 2024
Piping flanges and fittings on this scope include product manufactured at ENGIC's own plant in Vasai East, Palghar, Maharashtra (Mumbai region).
- End operator
- Petrobras
- Contracting party
- Seatrium O&G (Americas) Limited
- Location
- Búzios pre-salt field, Santos Basin, Brazil
- Asset status
- Delivered 2025
- Parent project value
- US$3B+ EPC contractPublished value of the overall project, not ENGIC revenue.
- Categories
- Valve Systems