FPSO P-78 (Búzios 7)

Newbuild FPSO

What the record says

P-78 is the culmination of over 15 years of Seatrium collaboration with Petrobras, rated at 180,000 bopd. Delivered in 2025 as the first of the P-78 / P-80 / P-82 / P-83 newbuild series, cementing Seatrium's position as the only shipyard with the Brazilian track record to meet Petrobras's 20–25% local content requirement. ENGIC executed during the final 2024 construction phase.

Direct contract — valve and piping works to Seatrium O&G Americas, Aug–Nov 2024

Piping flanges and fittings on this scope include product manufactured at ENGIC's own plant in Vasai East, Palghar, Maharashtra (Mumbai region).

End operator
Petrobras
Contracting party
Seatrium O&G (Americas) Limited
Location
Búzios pre-salt field, Santos Basin, Brazil
Asset status
Delivered 2025
Parent project value
US$3B+ EPC contractPublished value of the overall project, not ENGIC revenue.
Categories
Valve Systems