InsightsPractical thinking for project delivery.
Engineering, Procurement & Construction Management, manufacturing, and the decisions that affect quality, cost and delivery.
Featured insightDocumentation & Inspection
A purchase order that asks for EN 10204 3.2 without naming who signs it, and without a notification period in the ITP, has not bought third-party verification. It has bought an argument at the point of despatch.
7 min read
Read the article →More insights
Products & Technical Supply
A named credit states what ENGIC was contracted to do, and for whom. It does not say the end operator appointed ENGIC, and the figure beside it is the published value of the overall project, not ENGIC revenue.
Procurement & Supply Chain
An enquiry reading '6 inch 300# WN flanges, ASTM A105, quantity 40' can be priced by any supplier and satisfied by several materially different products. Each missing field transfers a decision from the specification to whoever is quoting.
Products & Technical Supply
A gate valve held part-open will destroy its own seat. A check valve sized for the line rather than the flow will slam. Neither shows up on a datasheet review, and both show up during commissioning.
Documentation & Inspection
In industrial and EPCM project environments, a product is not truly complete when it arrives at site.