# FPSO P-78 (Búzios 7)

> Newbuild FPSO

P-78 is the culmination of over 15 years of Seatrium collaboration with Petrobras, rated at 180,000 bopd. Delivered in 2025 as the first of the P-78 / P-80 / P-82 / P-83 newbuild series, cementing Seatrium's position as the only shipyard with the Brazilian track record to meet Petrobras's 20–25% local content requirement. ENGIC executed during the final 2024 construction phase.

- Division: Manufacturing
- Contract type: Direct
- ENGIC role: Direct contract — valve and piping works to Seatrium O&G Americas, Aug–Nov 2024
- End operator: Petrobras
- Contracting party: Seatrium O&G (Americas) Limited
- Location: Búzios pre-salt field, Santos Basin, Brazil
- Span: 2024
- Asset status: Delivered 2025
- Parent project value (overall project, not ENGIC revenue): US$3B+ EPC contract
- Categories: Valve Systems

Piping flanges and fittings on this scope include product manufactured at ENGIC's own plant in Vasai East, Palghar, Maharashtra (Mumbai region).

## Sources

- [Seatrium — P-78 delivery milestone](https://www.minichart.com.sg/2025/07/18/seatrium-ltd-achieves-21-3b-order-book-delivers-major-fpso-to-petrobras-strong-growth-in-offshore-green-energy-solutions-1/)
- [Offshore Energy — Seatrium FPSO orderbook](https://www.offshore-energy.biz/petrobras-taps-seatrium-for-construction-of-8-15-billion-fpso-pair/)

HTML page: https://engic.ltd/project-credits/fpso-p-78-buzios-7